Florida Boulevard Pump Stations
Location: Baton Rouge, Louisiana
Client: City of Baton Rouge and Parish of East Baton Rouge
Construction Cost: $21.8 million
Wharton-Smith constructed eight new wastewater pump stations. These pump stations ranged in size from 765 GPM up to 30.5 MGD for the largest of the stations. The project consisted of the construction of 2 electrical buildings, 2 biological odor control systems and 8 new generators. Following the construction and commissioning of the new stations, the existing stations were demolished, and site work completed. This project was completed in June 2019.