Hamlin Water Reclamation Facility
Location: Winter Garden, FL
Client: Orange County Board of County Commissioners
Size: 5 MGD
Construction Cost: $110.6 million
Wharton-Smith is providing general contracting services at the Hamlin Water Reclamation Facility for the Orange County Board of Commissioners. This new 5.0 MGD facility includes all systems such as a preliminary treatment structure with screening, grit, and odor control; activated sludge treatment train with BNR process and diffused aeration; process air blower system and building; secondary clarifiers and clarifier splitter box; plant pump stations; tertiary filters; chlorine contact tank; chemical feed and storage systems; sludge holding tanks, gravity belt thickener equipment, a 5 million gallon ground storage tank, and a variety of pumps (NRCY, Scum, RAS, WAS, VT Transfer, VT HSP). Also included in this project is 3,600 linear feet of 36” diameter off-site force main and an off-site, $8 million master pump station complete with a CIP wet well, electrical building, and odor control system.
See Project Gallery below.