Highland/Kenilworth Multiple Pump Stations

The project consists of the construction of 12 new pump stations the largest of which is capable of pumping 23.3 MGD. The program stations include new electrical buildings, generators, a wash-down facilities, flowmeter vaults, generators, and odor control. This project also includes the rehabilitation of the existing 26 MGD Pump Station 1 which involves replacing the pumps, piping, electrical system, instrumentation and controls. The Caisson Method was utilized for the construction of the wet wells in order to accelerate the schedule. 

Project Gallery